GROVE COLLABORATIVE / MATURE PRODUCT EXTENSION

Product quality beyond the handoff.

Product quality beyond the handoff.

I joined Grove through Heady to extend an established native commerce app. I defined the Order History product model, designed production-ready mobile states, and reviewed real iOS and Android builds with engineering—carrying product quality beyond the mockup.

ROLE

Senior Product Designer

TEAM

Grove + Heady product, design, and engineering

SCOPE

Order History · production QA · Liquid Glass · Supplement Facts

PROJECT EVIDENCE

at a glance

4

core workstreams

57

project tickets worked through

Design, implementation,

bugs, spikes, and QA

project tickets worked through Design, implementation, bugs, spikes, and QA

9

Order History

implementation tickets

2

iOS + Android

4

commerce levels modeled

IMPLEMENTATION BOUNDARY

Order History implementation was in progress; post-launch product metrics were not yet available.

01 / CONTEXT

Change the system without adding another layer of complexity.

Change the system without adding another layer of complexity.

Grove’s mobile app was already rebuilt. I worked inside a mature product—turning commerce edge cases into a native model, reviewing production builds, and choosing when platform behavior should win over custom fidelity.

Grove’s mobile app was already rebuilt. I worked inside a mature product—turning commerce edge cases into a native model, reviewing production builds, and choosing when platform behavior should win over custom fidelity.

DEFINED / PRODUCT MODEL

Order History across order, shipment, tracking, and item states.

DROVE / BUILD QUALITY

Cross-platform QA across real builds, requirements, and design source.

DESIGNED / SYSTEM EXTENSION

Liquid Glass decisions and scalable Supplement Facts treatments.

02 / ORDER HISTORY — PRODUCT MODEL

Design the structure, then test it against real orders.

Design the structure, then test it against real orders.

Before the client could provide real account history, I used provisional order content to compare list and detail structures. Once real histories arrived, I translated them into concrete interface states, collected feedback on the screens themselves, and converged one native hierarchy.

Before the client could provide real account history, I used provisional order content to compare list and detail structures. Once real histories arrived, I translated them into concrete interface states, collected feedback on the screens themselves, and converged one native hierarchy.

01 / LAYOUT EXPLORATION

Explore list and detail structures while real order history was still pending.

02 / STATE VALIDATION

Turn real orders into visible states the client could evaluate.

03 / CONVERGED NATIVE SYSTEM

Resolve the validated states into one clear native hierarchy.

03 / ORDER HISTORY — SPLIT FULFILLMENT

Design the exception as part of the model.

Design the exception as part of the model.

One order could resolve into multiple shipments, tracking states, removals, refunds, and partial outcomes.

One order could resolve into multiple shipments, tracking states, removals, refunds, and partial outcomes.

I kept the customer-facing order rollup intact while exposing fulfillment detail only where it changed what the customer needed to understand.

ORDER LEVEL / CUSTOMER ROLLUP

Keep one customer-facing order even when fulfillment splits underneath it.

SHIPMENT LEVEL / FULFILLMENT DETAIL

Group items, tracking, and progress by shipment without creating a second product model.

04 / ORDER HISTORY — IMPLEMENTATION MODEL

Turn complex commerce behavior into buildable rules.

Turn complex commerce behavior into buildable rules.

I documented how list items, order summaries, progress states, and bundled sets should behave across normal, removed, and refunded conditions. I then translated the approved model into reusable components and nine implementation tickets for engineering.

I documented how list items, order summaries, progress states, and bundled sets should behave across normal, removed, and refunded conditions. I then translated the approved model into reusable components and nine implementation tickets for engineering.

EDGE-CASE SET / NORMAL · REMOVED · REFUNDED OR PARTIAL

NORMAL BUNDLE

Keep the bundle recognizable as one parent item while allowing customers to inspect its child products.

REMOVED ITEM

Update item count, pricing, and order totals while preserving the removed child’s historical meaning.

refunded ITEM

Keep refunded items visible and reconcile their allocated refund separately from the remaining order total.

IMPLEMENTATION LOGIC

01

STATE MODEL

One component family covers normal, removed, and refunded bundle states.

02

CALCULATION RULES

Item count, allocated price, refunds, and order totals reconcile together.

03

REUSABLE DELIVERY

Approved behavior became shared list, summary, progress, and update components.

IMPLEMENTATION HANDOFF

9 Order History implementation tickets translated the approved model into engineering work. Implementation was in progress.

05 / PRODUCTION QA — IMPLEMENTATION REVIEW

The work continues after the mockup.

The work continues after the mockup.

I reviewed real iOS and Android builds against the approved design and requirements, then worked with engineers to determine whether each discrepancy belonged in the build, the design source, or the requirement.

I reviewed real iOS and Android builds against the approved design and requirements, then worked with engineers to determine whether each discrepancy belonged in the build, the design source, or the requirement.

APPROVED DESIGN SOURCE

Scheduled-order component specification

REVIEW SCOPE

Typography

Hierarchy

Components

Spacing

SELECTED FINDINGS

1

CONTAINER SPACING

2

CTA HEIGHT

3

ICON SIZE + ALIGNMENT

REAL android BUILD

Scheduled-order component

implementation

DECISION PATHS

Correct the build
Update the design source
Clarify the requirement

06 / iOS 27 — LIQUID GLASS READINESS

Audit the platform change before prescribing fixes.

Audit the platform change before prescribing fixes.

For Grove’s iOS 27 update, I reviewed Liquid Glass behavior across Grove’s existing screens in the new build, documented regressions across navigation, headers, controls, and spacing, and organized the findings into prioritized engineering adjustments.

For Grove’s iOS 27 update, I reviewed Liquid Glass behavior across Grove’s existing screens in the new build, documented regressions across navigation, headers, controls, and spacing, and organized the findings into prioritized engineering adjustments.

01 / PRODUCT-WIDE REVIEW

Audit Liquid Glass behavior across commerce, account, navigation, and content surfaces.

PROVES / breadth before intervention.

02 / STRUCTURAL REGRESSIONS

Document header, navigation, search, and inset changes that altered the established hierarchy.

PROVES / structural issues were identified across multiple surfaces.

03 / COMPONENT REGRESSIONS

Define corrections for badges, icons, chevrons, buttons, pagination, and loading states.

PROVES / audit findings became component-level specifications.

04 / ENGINEERING HANDOFF

Organize prioritized iOS 27 adjustments into implementation-ready engineering work.

PROVES / the readiness audit became actionable delivery guidance.

OWNERSHIP

AUDITED / iOS 27 build behavior across Grove surfaces
DELIVERED / prioritized engineering adjustments

STATUS

Engineering adjustments were documented; final corrected builds are not shown in this evidence set.

07 / BUILD QUALITY + SOURCE OF ERROR

Correct the source of error—not just the visible symptom.

Correct the source of error—not just the visible symptom.

A ticket flagged the PDP behavior as incorrect.

Before asking engineering to change it, I checked the

current design source against Android build 6284.

They already agreed. Grove design confirmed the PDP acceptance criteria were incorrect; the conditional behavior actually belonged to the Cart state.

A ticket flagged the PDP behavior as incorrect.

Before asking engineering to change it, I checked the

current design source against Android build 6284.

They already agreed. Grove design confirmed the PDP acceptance criteria were incorrect; the conditional behavior actually belonged to the Cart state.

CURRENT DESIGN / PDP SUBSCRIPTION

ANDROID BUILD 6284 / SAME STATE

MATCH / Subscribe is selected and frequency remains visible in both.

01 / ALIGNED EVIDENCE

Compare the current design source against Android build 6284

before assuming the implementation is wrong.

PROVES / the current build already reflected the intended PDP behavior.

DROID-3232 / ACCEPTANCE CRITERIA

GROVE DESIGN CONFIRMATION

CONFIRMED / “PDP always shows the frequency dropdown (AC above is incorrect).”

02 / REQUIREMENT CONFLICT

Trace the mismatch back to acceptance criteria that contradicted

both the current design source and the Android build.

PROVES / the PDP requirement—not the implementation—was the source of error.

DECISION

Preserve the correct PDP implementation, flag the incorrect AC, and redirect the issue to the affected Cart state.

08 / SUPPLEMENT FACTS / VARIABLE CONTENT

Build for variation, then return to the shared system.

Build for variation, then return to the shared system.

My responsibility was the native product treatment—not extraction, backend validation, storage, or schema. I expanded the first web reference into a structured model that could handle real catalog variation, then refined it with Grove design and aligned it to the shared component direction. From there, I adapted that structure to Grove’s native patterns, moving long-form content from the PDP into a bottom sheet.

My responsibility was the native product treatment—not extraction, backend validation, storage, or schema. I expanded the first web reference into a structured model that could handle real catalog variation, then refined it with Grove design and aligned it to the shared component direction. From there, I adapted that structure to Grove’s native patterns, moving long-form content from the PDP into a bottom sheet.

SOURCE A / FIRST STRUCTURED COMPONENT MODEL

01 / MODEL THE VARIATION

Turn the first web reference into a structured model that could handle real catalog variation.

PROVES / one structure could support materially different content states.

SOURCE B / EARLY FULL-PDP EXPLORATION

02 / STRESS-TEST IN CONTEXT

Pressure-test the structured model inside the native PDP across increasing content complexity.

PROVES / the model could scale without breaking the surrounding product hierarchy.

SOURCE C / REVIEW + UPDATED REFERENCE HIERARCHY

03 / CONVERGE ON THE SHARED SYSTEM

Review with Grove design and newer reference material refined the hierarchy and converged the work on a stronger shared component direction.

PROVES / the solution improved through collaboration instead of preserving the first design unchanged.

ATTRIBUTION / Grove design brought newer FDA reference context and established the shared component-layout direction.

SOURCE D / SHARED COMPONENT APPLIED INLINE

04 / APPLY THE SHARED DIRECTION

Bring the shared component direction into the native product.

PROVES / the shared content model could be carried into the native PDP without rebuilding it as a separate mobile system.

ATTRIBUTION / I applied and refined Grove’s shared component direction in the native product.

SOURCE E / FINAL APPROVED NATIVE TREATMENT — PDP ENTRY + BOTTOM SHEETS

05 / ADAPT IT TO NATIVE

Keep the shared content structure, then adapt its presentation to Grove’s native interaction patterns and long-content behavior.

PROVES / shared-system alignment did not become a separate mobile fork—or a literal copy of the shared layout.

NATIVE DECISION / Move long-form Supplement Facts from the inline PDP treatment into a bottom sheet that better matched Grove’s mobile patterns.

OUTCOMES / WHAT CARRIED FORWARD

Product models, platform decisions, and implementation judgment ready to carry forward.

Product models, platform decisions, and implementation judgment ready to carry forward.

IMPLEMENTATION

Order History reached an engineering-ready state across nine implementation tickets.

SYSTEM

One model linked order-level status to shipment, tracking,

and item-level states.

IMPLEMENTATION QUALITY

Real iOS and Android builds were reviewed against current design intent and product requirements.

MEASUREMENT BOUNDARY

Order History implementation was in progress; attributable post-launch outcome metrics were not yet available.

REFLECTION

The strongest pattern was treating implementation as part of product design—

so intent could survive data complexity, platform change, and the handoff to engineering.

The strongest pattern was treating implementation as part of product design—

so intent could survive data complexity, platform change, and the handoff to engineering.

PREVIOUS CASE

CurbWaste / operational product systems