GROVE COLLABORATIVE / MATURE PRODUCT EXTENSION
I joined Grove through Heady to extend an established native commerce app. I defined the Order History product model, designed production-ready mobile states, and reviewed real iOS and Android builds with engineering—carrying product quality beyond the mockup.
ROLE
Senior Product Designer
TEAM
Grove + Heady product, design, and engineering
SCOPE
Order History · production QA · Liquid Glass · Supplement Facts

PROJECT EVIDENCE
at a glance
4
core workstreams
57
9
Order History
implementation tickets
2
iOS + Android
4
commerce levels modeled
IMPLEMENTATION BOUNDARY
Order History implementation was in progress; post-launch product metrics were not yet available.
01 / CONTEXT
DEFINED / PRODUCT MODEL
Order History across order, shipment, tracking, and item states.
DROVE / BUILD QUALITY
Cross-platform QA across real builds, requirements, and design source.
DESIGNED / SYSTEM EXTENSION
Liquid Glass decisions and scalable Supplement Facts treatments.
02 / ORDER HISTORY — PRODUCT MODEL
01 / LAYOUT EXPLORATION
Explore list and detail structures while real order history was still pending.

02 / STATE VALIDATION
Turn real orders into visible states the client could evaluate.

03 / CONVERGED NATIVE SYSTEM
Resolve the validated states into one clear native hierarchy.

03 / ORDER HISTORY — SPLIT FULFILLMENT
I kept the customer-facing order rollup intact while exposing fulfillment detail only where it changed what the customer needed to understand.
ORDER LEVEL / CUSTOMER ROLLUP
Keep one customer-facing order even when fulfillment splits underneath it.

SHIPMENT LEVEL / FULFILLMENT DETAIL
Group items, tracking, and progress by shipment without creating a second product model.

04 / ORDER HISTORY — IMPLEMENTATION MODEL
EDGE-CASE SET / NORMAL · REMOVED · REFUNDED OR PARTIAL
NORMAL BUNDLE
Keep the bundle recognizable as one parent item while allowing customers to inspect its child products.

REMOVED ITEM
Update item count, pricing, and order totals while preserving the removed child’s historical meaning.

refunded ITEM
Keep refunded items visible and reconcile their allocated refund separately from the remaining order total.

IMPLEMENTATION LOGIC
01
STATE MODEL
One component family covers normal, removed, and refunded bundle states.
02
CALCULATION RULES
Item count, allocated price, refunds, and order totals reconcile together.
03
REUSABLE DELIVERY
Approved behavior became shared list, summary, progress, and update components.
IMPLEMENTATION HANDOFF
9 Order History implementation tickets translated the approved model into engineering work. Implementation was in progress.
05 / PRODUCTION QA — IMPLEMENTATION REVIEW
APPROVED DESIGN SOURCE
Scheduled-order component specification

REVIEW SCOPE
Typography
Hierarchy
Components
Spacing
SELECTED FINDINGS
1
CONTAINER SPACING
2
CTA HEIGHT
3
ICON SIZE + ALIGNMENT
REAL android BUILD
Scheduled-order component
implementation

DECISION PATHS
Correct the build
Update the design source
Clarify the requirement
06 / iOS 27 — LIQUID GLASS READINESS

01 / PRODUCT-WIDE REVIEW
Audit Liquid Glass behavior across commerce, account, navigation, and content surfaces.
PROVES / breadth before intervention.

02 / STRUCTURAL REGRESSIONS
Document header, navigation, search, and inset changes that altered the established hierarchy.
PROVES / structural issues were identified across multiple surfaces.

03 / COMPONENT REGRESSIONS
Define corrections for badges, icons, chevrons, buttons, pagination, and loading states.
PROVES / audit findings became component-level specifications.

04 / ENGINEERING HANDOFF
Organize prioritized iOS 27 adjustments into implementation-ready engineering work.
PROVES / the readiness audit became actionable delivery guidance.
OWNERSHIP
AUDITED / iOS 27 build behavior across Grove surfaces
DELIVERED / prioritized engineering adjustments
STATUS
Engineering adjustments were documented; final corrected builds are not shown in this evidence set.
07 / BUILD QUALITY + SOURCE OF ERROR
CURRENT DESIGN / PDP SUBSCRIPTION

ANDROID BUILD 6284 / SAME STATE

MATCH / Subscribe is selected and frequency remains visible in both.
01 / ALIGNED EVIDENCE
Compare the current design source against Android build 6284
before assuming the implementation is wrong.
PROVES / the current build already reflected the intended PDP behavior.
DROID-3232 / ACCEPTANCE CRITERIA

GROVE DESIGN CONFIRMATION

CONFIRMED / “PDP always shows the frequency dropdown (AC above is incorrect).”
02 / REQUIREMENT CONFLICT
Trace the mismatch back to acceptance criteria that contradicted
both the current design source and the Android build.
PROVES / the PDP requirement—not the implementation—was the source of error.
DECISION
Preserve the correct PDP implementation, flag the incorrect AC, and redirect the issue to the affected Cart state.
08 / SUPPLEMENT FACTS / VARIABLE CONTENT
SOURCE A / FIRST STRUCTURED COMPONENT MODEL

01 / MODEL THE VARIATION
Turn the first web reference into a structured model that could handle real catalog variation.
PROVES / one structure could support materially different content states.
SOURCE B / EARLY FULL-PDP EXPLORATION

02 / STRESS-TEST IN CONTEXT
Pressure-test the structured model inside the native PDP across increasing content complexity.
PROVES / the model could scale without breaking the surrounding product hierarchy.
SOURCE C / REVIEW + UPDATED REFERENCE HIERARCHY

03 / CONVERGE ON THE SHARED SYSTEM
Review with Grove design and newer reference material refined the hierarchy and converged the work on a stronger shared component direction.
PROVES / the solution improved through collaboration instead of preserving the first design unchanged.
ATTRIBUTION / Grove design brought newer FDA reference context and established the shared component-layout direction.
SOURCE D / SHARED COMPONENT APPLIED INLINE

04 / APPLY THE SHARED DIRECTION
Bring the shared component direction into the native product.
PROVES / the shared content model could be carried into the native PDP without rebuilding it as a separate mobile system.
ATTRIBUTION / I applied and refined Grove’s shared component direction in the native product.
SOURCE E / FINAL APPROVED NATIVE TREATMENT — PDP ENTRY + BOTTOM SHEETS

05 / ADAPT IT TO NATIVE
Keep the shared content structure, then adapt its presentation to Grove’s native interaction patterns and long-content behavior.
PROVES / shared-system alignment did not become a separate mobile fork—or a literal copy of the shared layout.
NATIVE DECISION / Move long-form Supplement Facts from the inline PDP treatment into a bottom sheet that better matched Grove’s mobile patterns.
OUTCOMES / WHAT CARRIED FORWARD
IMPLEMENTATION
Order History reached an engineering-ready state across nine implementation tickets.
SYSTEM
One model linked order-level status to shipment, tracking,
and item-level states.
IMPLEMENTATION QUALITY
Real iOS and Android builds were reviewed against current design intent and product requirements.
MEASUREMENT BOUNDARY
Order History implementation was in progress; attributable post-launch outcome metrics were not yet available.
REFLECTION
PREVIOUS CASE